SDC completely integrated the bottle loading system with the existing bottle filling machine.
This project was presented to SDC in search of a cost effective, high speed bottle loading system. The SDC system unloaded bottles from cardboard boxes and placed them into pucks which supplied an existing bottle filling machine.